Submit Your Suggestions For Field View

Bulk upload of forms / Import from VfP to multiple geometry locations

Currently uploading a drawing to a geometry location can only be done one drawing at a time - and during the time that drawing is uploading you cannot continue using the website to do other tasks.

Suggested Improvement: The ability to select multiple drawings and specify which locations of the geometry that each drawing applies to and then to bulk upload in the background. For example: I have drawings for L1 to L5. I want to select these 5 drawings, specify which locations in my geometry these 5 apply to and then press Upload. All 5 drawings would then upload in the background - allowing me to continue with other work while this is being done.

Benefits: Project Admins. Currently uploading drawings for buildings with multiple floors and multiple sheets can take around 2 hours - and no other work can happen in this time. Batch upload would significantly improve the speed of setting up projects

  • Mark Biscoe
  • May 5 2016
  • Attach files
  • Guest commented
    January 16, 2019 05:55

    Agreed - this would be insanely helpful and really speed up administration time as a number of our projects have multiple floors and it is time consuming waiting for each drawing to upload individually. 

Dear Viewpoint Suggestion Box contributor;

We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs. Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.

1515 SE Water Avenue, Suite 300, Portland, OR 97214 |  800.333.3197  | Contact Us | Terms of Use | Privacy | Support Policies

© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.